When RetainX shows Mu / ΦMn > 1.0 under Stem, the wall's stem isn't strong enough to resist the bending the soil puts on it. This article explains what that means in plain terms and the three practical ways to fix it.
What the check means
The soil behind a retaining wall pushes the stem forward, like a hand pushing on the top of a fence post. The stem is held at the bottom by the footing, so that push bends the stem, and the bending is greatest right where the stem meets the footing.
- Mu is the bending the soil (and any surcharge, adjacent footing or seismic load) puts on the stem, with the code's safety factors applied.
- ΦMn is how much bending the stem can take, from its thickness, its rebar and the concrete strength.
The ratio is demand divided by capacity:
\[ \text{Ratio} = \frac{M_u}{\phi M_n} \]
Below 1.0 the stem is strong enough. Above 1.0 it isn't. A ratio of 1.48 means the soil is asking 48% more of the stem than it can safely give.
On a two-segment wall, MuTop / ΦMnTop > 1.0 is the same check for the thinner upper segment, taken where it sits on the lower one. The fixes below apply to whichever segment fails.
Why taller walls get hard fast
The bending at the bottom of the stem grows with the cube of the wall height. Going from 8 ft of retained soil to 10 ft doesn't add 25% more bending. It roughly doubles it:
\[ \left(\frac{10}{8}\right)^3 \approx 1.95 \]
That's why a stem that works fine at one height can fail badly a couple of feet taller.
The three ways to fix it
1. More rebar: a bigger bar or tighter spacing
The vertical bars in the stem are what actually resist the bending, so adding steel is usually the cheapest fix. You can use a bigger bar, put the bars closer together, or both. The steel area per foot of wall is the bar's area times 12, divided by the spacing in inches:
- #4 (0.20 in² per bar): 0.20 in²/ft at 12 in, 0.30 at 8 in, 0.40 at 6 in
- #5 (0.31 in² per bar): 0.31 in²/ft at 12 in, 0.47 at 8 in, 0.62 at 6 in
- #6 (0.44 in² per bar): 0.44 in²/ft at 12 in, 0.66 at 8 in, 0.88 at 6 in
- #7 (0.60 in² per bar): 0.60 in²/ft at 12 in, 0.90 at 8 in, 1.20 at 6 in
- #8 (0.79 in² per bar): 0.79 in²/ft at 12 in, 1.19 at 8 in, 1.58 at 6 in
Spacing tighter than about 6 in gets hard to place and consolidate concrete around. At that point a bigger bar is the better move.
2. A thicker wall
A thicker stem holds its bars farther from the front face, which gives them more leverage, so the same bars resist more bending. A thicker wall also helps the shear check. It costs more concrete, but it's often the right answer for taller walls, or when the bars are already big and close together.
3. Both together
On taller walls the economical answer is usually a modest thickness increase plus a bar change, rather than pushing either one to its limit.
An example
A wall retaining 10.5 ft of soil (115 pcf, 30° friction angle) with a 100 psf surcharge, a 10 in stem and #5 bars at 12 in. RetainX shows a moment ratio of 1.48, so it fails. Here's what each change does:
- 10 in wall, #5 @ 12 in (the start): 1.48, fails
- 10 in wall, #6 @ 12 in: 1.07, fails
- 10 in wall, #5 @ 8 in: 1.01, fails, just barely
- 12 in wall, #5 @ 12 in: 1.15, fails
- 10 in wall, #5 @ 6 in: 0.77, passes
- 10 in wall, #6 @ 8 in: 0.73, passes
- 12 in wall, #5 @ 8 in: 0.78, passes
Any of the last three works. Pick based on what's easiest to build and what the rest of the design needs.
Rules of thumb for sizing
These are common starting points for a cantilever wall, where H is the total height from the bottom of the footing to the top of the wall. They get you close. RetainX checks the actual design.
- Stem thickness at the base: about H/10 to H/12, and not less than 8 in. A 12 ft wall starts around 12 to 14 in.
- Stem thickness at the top: at least 8 in, so concrete can be placed around the bars.
- Footing width: about 0.5H to 0.7H.
- Toe length: about one-third of the footing width.
- Footing thickness: about H/10 to H/12, and not less than 12 in.
Put the bars on the soil side
This matters as much as the bar size. The soil bends the stem so that its back face (the soil side) is stretched. Concrete is weak when stretched, so that's where the main vertical bars have to be, held at the cover shown on the drawings. Bars that drift toward the middle of the wall, or end up on the front face, do far less than the calculation assumes. A wall can fail in the field with exactly the "right" bars in it if they're on the wrong side.
Two things to watch
- Too much steel. Past a point, adding bars stops helping, because the concrete crushes before the steel stretches. RetainX flags this as a steel strain problem. When you see it, make the wall thicker instead of adding more bars.
- Vertical load on top of the wall. If the wall also carries a load on top, such as a building wall, a deck or a beam, RetainX checks bending and that load together. See How RetainX Checks Wall Stems for Combined Axial Load and Bending.
After any change, rerun the design and confirm every box in the bottom row is green. These guidelines help you get to a passing design faster, but a wall still needs to be designed and checked for its actual site.